INFRASTRUCTURE INVESTMENT PROPOSAL - 2004
A-SEWERAGE AND VARIOUS SUPERSTRUCTURE CONSTRUCTION WHICH WILL BE EXECUTED
BY KASKI'S BUDGET
A.1- SEWER CONSTRUCTION IN HOCA AHMET YESEVİ STREET
Explanation of Project: Sewerage line construction in various districts
of Hoca Ahmet Yesevi Street.
Aim of the Project : To discharge the wastewaters of houses in Hoca Ahmet
Yesevi Street.
Estimated Project Cost:
Cost of 2004 : (960.000.000.000x1.25) = 1.200.000.000.000.-TL
Concrete pipe that will be used (Concrete Pipe) :
Ø 200 : 1500 mt.
Ø 300 : 6000 mt.
Ø 400 : 500 mt.
Total : 8.000 mt.
A.2- SEWER CONSTRUCTION IN ZÜMRÜT STREET
Explanation : Sewer line construction by prefabricated concrete pipes
in various districts of Zümrüt Street.
Aim of the Project: To discharge the wastewater in Zümrüt Street.
Estimated Project Cost:
Cost of 2004 :(1.080.000.000.000x1.25)=1.350.000.000.000.-TL
Concrete pipe that will be used (Concrete Pipe) :
Ø 200 : 1500 mt.
Ø 300 : 6750 mt.
Ø 400 : 750 mt
Total : 9000 meters
A.3- SEWER CONSTRUCTION IN SARAY BOSNA-FEVZİOĞLU STREET
Explanation: Sewer line construction by prefabricated concrete pipes
in various districts of Saray Bosna and Fevzioğlu Streets.
Aim of the Project: Subscriber parcel connection in Saray Bosna and Fevzioğlu
Streets.
Estimated Project Cost:
Cost of 2004 : (1.020.000.000.000 x 1.25) =1.275.000.000.000.-TL
Reinforced concrete pipe that will be used in the project :
Ø 200 : 3000 mt.
Ø 300 : 5000 mt.
Ø 400 : 1000 mt.
Total : 9000 meters
A.4-SEWER CONSTRUCTION IN ZİYA GÖKALP - YENİDOĞAN STREET
Explanation: Sewer line construction by prefabricated concrete pipes have
laid in various districts of Ziya Gökalp-Yenidoğan Streets.
Aim of the Project: To discharge the wastewaters in Ziya Gökalp-Yenidoğan
Street.
Estimated Project Cost:
Cost of 2004 : (440.000.000.000 x 1.25)=550.000.000.000.-TL
Reinforced concrete pipe that will be used in the project :
Ø 300 : 500 mt.
Ø 400 : 1000 mt.
Ø 500 : 1000 mt.
Total : 2.500 meters
A.5- SEWER CONSTRUCTION IN GULTEPE STREET-KÖŞK STREET
Explanation: Sewer line construction by prefabricated concrete pipes have
laid in various districts of Gültepe and Kösk Streets.
Aim of the Project: To discharge the wastewaters in Gültepe and Kösk Street.
Estimated Project Cost:
Cost of 2004 : (416.000.000.000 x 1.25) =520.000.000.000.-TL
Reinforced concrete pipe that will be used in the project :
Ø 300 : 1500 mt.
Ø 400 : 400 mt.
Ø 500 : 600 mt.
Total : 2.500 meter
A.6-SEWER CONSTRUCTION IN GEDIRIS - ERENKÖY STREET
Explanation : Sewer line construction by prefabricated concrete pipes
have laid in various districts of Gediris Erenköy Street.
Aim of the Project : To discharge the wastewaters in Gediris-Erenköy Street.
Estimated Project Cost:
Cost of 2004 : (860.000.000.000 x 1.25) =1.075.000.000.000.-TL
Reinforced concrete pipe that will be used in the project :
Ø 200 : 2000 mt.
Ø 300 : 6000 mt.
Total : 8.000 meters
A.7-SECURITY SYSTEM
Explanation: To control the security of water production and depot centers
with the electronic security system which supplies potable water to Kayseri
and to protect with the infrared ray fences.
Aim of the Project: To transfer the water to Gediris Transmission Station,
the Gediris depot and Sakarya depot with the remote control without personnel.
Estimated Project Cost:
Cost of 2004: (60.000$x1.920.000) =115.200.000.000.-TL.
A.8-CHLORINE SYSTEM
Explanation: To include chlorine automatically the system where potable
water of Kayseri is supplied .include the automatic chlorine system into
the potable water of Kayseri.
Aim of the Project: Homogeneous chlorine will be supplied from Beştepeler,
Keykubat, Karpuzatan and Eğribucak Transmission Stations according to
flow and scada will be informed regarding the amount of chlorine.
Estimated Project Cost:
Cost of 2004 : (112.000x1.920.000)=215.040.000.000.-TL.
A.9-SCADA SYSTEM
Explanation: To transfer the water production and depots by remote control
where potable water of Kayseri is supplied.
Aim of the Project: To integrate new stations to the existing Scada System
and rehabilitation of it.
Estimated Project Cost:
Additional Stations
Cost of 2004:(55.000 $x1.920.000)= 105.600.000.000.-TL.
Rehabilitation of existing system :
Cost of 2004:160.000$x1.920.000)=307.200.000.000.-TL.
A.10-WELL BUILDINGS, DRILLING EQUIPMENTS AND THEIR CONNECTIONS
Explanation: 12 Nos .Wells which were opened by İller Bank for our General
Directorate then well buildings were constructed in area with electrical
and electronically equipments that were mounted in the buildings.
Aim of the Project: It is requested to activate the opened wells so as
to treat potable water which is given to network.
Estimated Project Cost:
Cost of 2004: 650.000$x1.920.000=1.248.000.000.000.TL.
A.11- PROTECTION OF THE STEEL PIPE LINE BY CATHODES METHOD
Explanation: This system which is called as cathodes method is protected
the existing steel pipe line against to the corrosion.
Aim of the Project: To increase the lifetime of the steel pipes due to
expensiveness of erection, commissioning and maintenance costs.
Estimated Project Cost:
Cost of 2004 : (120.000.000.000x1,25)=150.000.000.000.-TL.
A.12-MAHRUMLAR TRANSMISSION STATION AND EQUIPMENTS
Explanation: To transfer the water from 6 drilling well to depot. In addition
to two drilling wells in Mahrumlar, 2 wells were opened in 2001 and 1
well was opened in 2003.
Aim of the Project: To transmit the water ,which will be obtained from
6 wells, to depot in a cheapest cost.
Estimated Project Cost:
Cost of 2004 : (800.000.000.000x1,25) = 1.000.000.000.000.-TL.
A.13-CONSTRUCTION OF LARGE STORE BUILDING
Explanation : To construct store building so as to protect potable water
fittings spare parts and equipments in Germiraltı potable water facilities.
Aim of the Project : Machinery and Purchasing Department needs to have
closed area to be able to keep safely the water equipments ,fittings and
pipes so large store building is constructed by our administration.
Estimated Project Cost:
Cost of 2004 : (120.000.000.000 x 1.25) = 150.000.000.000.-TL
A.15-PAYMENT OF EXPROPRIATION AND ACCESS
Explanation:General Directorate of Kaski executed many projects in different
areas of the city, sometimes we have to pass the personal areas which
can be called personal and institutional areas so to pass the personal
and institutional areas our administration needs to have that areas to
add its own. To get the personal and institutional areas, our administration
has to make payments to them.
Aim of the Project : To be able not to break our services to the people
and having the personal and institutional areas to our own .So the services
will continue regularly.
Estimated Project Cost:
Cost of 2004 : 1.050.000.000.000.-TL.
B-POTABLE WATER CONSTRUCTION WORKS WHICH ARE EXECUTED BY USING KASKI'S
BUDGET
B.1-CONSTRUCTION OF POTABLE WATER NETWORK IN ERENKÖY (GEDIRIS) DISTRICT
Explanation : In Erenköy (Gediris Bağları) District, the population is
increasing day by day so the district is improved by municipality. Our
administration was constructed a water depot and potable water network
which can supply the water to the network for that district.
Aim of the Project : The south area of the Erenköy (Gediris) and Çay
Bağları disrtict our administration have executed potable water network.Under
the that project we supplied potable water to the buildings.
Estimated Project Cost:
Cost of 2004 : (600.000.000.000x1,25 )= 750.000.000.000.- TL
Potable water pipes which will be used :
Ø100 mm PE Pipe : 6000 mt.
Ø150 mm PE Pipe : 2000 mt.
Ø200 mm PE Pipe : 1000 mt.
Total 9000 mt.
B.2- TALAS DEPOT POTABLE WATER NETWORK REHABILITATION CONSTRUCTION
Explanation: The Talas network main depot ( Capacity : 15.000 m³) was
build in 1987 by İller Bank.The network was old, it had defected oftenly
that’s why rehabilitation construction was done.
Aim of the Project : The Pipe line is through the Erciyes University ,
Aşık Veysel Boulevard, Sivas Street ve Tuna Street and oftenly defected
. The former water network was replaced with the steel pipes
Estimated Project Cost:
Cost of 2004 :(1.100.000.000.000x1,25)= 1.375.000.000.000.-TL.
Potable water pipes which will be used:
Ø300 mm DI Pipe : 480 mt.
Ø350 mm DI Pipe : 1100 mt.
Ø400 mm DI Pipe : 1070 mt.
Ø500 mm Steel Pipe : 350 mt.
Ø600 mm Steel Pipe : 350 mt.
Ø800 mm Steel Pipe : 2800 mt.
Total 6250 mt.
B.3- KEYKUBAT DEPOT POTABLE WATER NETWORK REHABILITATION CONSTRUCTION
Explanation: The Keykubat network main depot ( Capacity : 10.000 m³) was
build in 1988 by İller Bank.The network was old, it had defected that’s
why rehabilitation construction was done.
Aim of the Project : The ACP Pipe line is through Yenidoğan District,
Bağdat Street, Erkilet Boulevard and oftenly defected. The former water
network was replaced with the steel pipes.
Estimated Project Cost:
Cost of 2004 :(900.000.000.000x1,25)= 1.125.000.000.000.-TL.
Potable water pipes which will be used:
Ø500 mm Steel Pipe : 550 mt.
Ø600 mm Steel Pipe : 2200 mt.
Ø700 mm Steel Pipe : 1100 mt.
Ø800 mm Steel Pipe : 1000 mt.
Total 4850 mt.
B.4- BEŞTEPELER DEPOT POTABLE WATER NETWORK REHABILITATION CONSTRUCTION
Explanation: The Bestepeler network main depot ( Capacity : 15.000 m³)
was build in 1988 by Iller Bank. The network was old it had defected,
that’s why rehabilitation construction was done.
Aim of the Project : The ACP Pipe line is through from Nazımbey street
to Düvenönü, from Camikebir District to Park Street, also from Fırat Street
to Kazım Karabekir District and it was defected. The former water network
was replaced with the steel pipes.
Estimated Project Cost:
Cost of 2004 :(800.000.000.000x1,25)= 1.000.000.000.000.-TL.
Potable water pipes which will be used:
Ø100 mm DI Pipe : 2000 mt.
Ø350 mm DI Pipe : 600 mt.
Ø400 mm DI Pipe : 550 mt.
Ø500 mm Steel Pipe : 750 mt.
Ø600 mm Steel Pipe : 400 mt.
Ø700 mm Steel Pipe : 300 mt.
Total 4600 mt.
B.5-SUB-DISTRICT POTABLE WATER REHABILITATION CONSTRUCTION
Explanation: Under the potable water rehabilitation project, former networks
was replaced with the DI Pipes and PE Pipes.
Aim of the Project :In many districts of our city, there are many potable
water networks the pipes were cast iron and ACP which were old so there
was water leakage. Against to water leak, potable water pipes were replaced
with DI pipe, PE pipe and PVC pipe.
Estimated Project Cost:
Cost of 2004 :(1.500.000.000.000x1,25)= 1.875.000.000.000.-TL.
Potable water pipes which will be used:
Ø100 mm PVC Pipe: 5000 mt.
Ø100 mm PE Pipe: 5000 mt.
Ø100 mm DI Pipe: 5000 mt.
Ø150 mm DI Pipe: 3000 mt.
Ø200 mm DI Pipe: 2000 mt.
Total 20.000 mt.
|